Construction of 8.0 kms of Highway No. 29 to two (2) lanes involving: 3.6 km of full construction to top lift asphalt, 3.2 km of top lift paving only, 1.2 km of sub-base gravels, base gravels and full depth paving. Construction of a 596m long bridge over Cache Creek Valley in addition to design and construction of a Cache Creek diversion and design/construction/maintenance of a temporary detour at the existing Cache Creek Bridge. The project commences 48.2 km NE of the intersection of Canyon Drive and Hwy 29, approximately 8.6 km, connecting back into Hwy 29 approximately 17.2 km south of Highway 97N.