Project consists of the demolition of an existing bridge, construction of a 51 meter, clear span bridge and removal of a detour bridge. This includes the installation of steel pipe piles, errection of structural steel, precast concrete members, deck panels, pile caps and bridge parapets, using instream diversions.
9,000 cubic meters rip rap will be drilled and blasted to provide protection for the guide banks and road works associated with the realignment and widening of the approaches.